The completed 360° stage at Al Enma Mall

Work  /  Interiors and Fit-out

Case study  ·  Mall fit-out, Riffa

Reimagining the heart of Al Enma Mall

An obsolete atrium fountain, transformed into a 360° stage for events and brand activations while the mall stayed open.

Client
Al Enma Mall
Location
Riffa, Kingdom of Bahrain
Completed
July 2026
Executed by
HBBS

01

The brief: transforming potential into purpose

The brief

At the heart of the mall stood a fountain that once defined the space. Over time it fell silent, occupying one of the mall’s most valuable locations.

Our approach

We set out to create a destination, not just a stage: a flexible space for retail activations, community events, exhibitions and brand experiences, preserving the mall’s identity and daily operation.

Scope
Demolition, structural works, fit-out
Systems
MEP, lighting and power
Al Enma Mall, Riffa
Al Enma Mall, Riffa
Before: the inactive fountain
Before: the inactive fountain
After: the new stage in use
After: the new stage in use

02

Engineering: what lay beneath the fountain

The challenge

Remove a fountain inside a working mall, with an unknown structure below and live public areas, escalators and tenants all around.

What we did

What looked like a simple demolition revealed heavily reinforced concrete with several layers of steel. We changed method, brought in specialised equipment and revised the engineering approach to finish safely and protect the structure around it.

Breaking out the fountain base
Breaking out the fountain base
Layers of steel reinforcement exposed
Layers of steel reinforcement exposed
Neighbouring displays protected
Neighbouring displays protected
Demolition inside the live atrium
Demolition inside the live atrium
Clearing and levelling the floor
Clearing and levelling the floor
Structural works in progress
Structural works in progress

03

The build, layer by layer

Structural works, levelling, epoxy finishes and LED lighting, built in phases around the mall’s opening hours.

Removing the fountain basin
Removing the fountain basin
The new platform takes shape
The new platform takes shape
Epoxy finish applied
Epoxy finish applied
Stage edge meets the staircase
Stage edge meets the staircase
Under-stair area before cladding
Under-stair area before cladding
Timber border with LED edge light
Timber border with LED edge light

04

Before and after: from fountain to 360° stage

Drag the handle to compare the same view, before and after.

Before: the fountain and planting in the atriumAfter: the completed 360° stage BeforeAfter
A 360° stagewith epoxy finish, timber border and LED edge lighting.
Future-ready powerbuilt in for events, exhibitions and activations.
Hidden storagecreated within the backdrop and elevator areas.

05

The details, designed to be used every day

LED edge lighting, flush storage doors and a stage that works from every side of the atrium.

The finished stage, atrium view
The finished stage, atrium view
LED edge lighting
LED edge lighting
Flush storage doors
Flush storage doors
Open from every side
Open from every side
Ready for events and activations
Ready for events and activations
The completed stage at Al Enma Mall

Completed July 2026

A new heart for the mall

A space designed to evolve with every event, every season and every visitor.

Start a project

Planning an event, an exhibition stand or a new space in Bahrain? Let’s talk.

Tell us what you have in mind. We will come back with ideas, a plan and a clear way to deliver it.